Case List
Smart Factory

Integrated IT deployment for auto parts factory

Gumi, Gyeongbuk · 2025 · Mid-sized company · 3 buildings · NEWsys
Integrated IT deployment for auto parts factory
At a glance
On siteGumi, Gyeongbuk · Mid-sized company · 3 buildings
Deployment Timeline2025
FieldSmart Factory
Key ScopeIndustrial PC · network · video security · monitoring

1. On-site situation

The three factory buildings were built at different times, so the network, CCTV, and equipment monitoring were all operating separately. When a failure occurred, it took half a day just to find which segment was affected.

2. Deployment scope

Industrial PC40 units (per-line MES terminals · panel PCs)
Network80 Omada WiFi 6 APs · 24 managed switches
Video Security120 VIGI IP Cameras · 4 NVRs
Monitoring200 IoT Sensor Points · Integrated Dashboard

3. How we solved it

4. Results

Incident response timeAverage 4 hours → 30 minutes
Network management points3 consoles → 1
Recording storage costsApproximately 60% reduction
"Before, when a problem occurred, we didn't know where to start looking, so we called every vendor. Now we just look at a single dashboard."
— Production Engineering Team contact
Are you preparing a similar site?
Tell us your site size and requirements, and we will propose a configuration along with similar references.
053-327-1917 · jwpark@newsyst.com
Steel plant network and security integration →
📞 전화 문의 053-327-1917 기술문의 →